Mexico’s Most
Connected Industrial
Platform.

Next-Gen Infrastructure

Immediate Access
to Power

High Performance
Digital Connectivity

On-site Gas Supply and
Water Infrastructure

Built for Power-Driven Industry

Data Centers

Aerospace

Medical Devices

Advanced Manufacturing

Data Centers

Aerospace

Medical Devices

Advanced Manufacturing

Mexico’s Most Power-Ready
Industrial Park

Why Tracende?

Core Infrastructure at a Glance:

Property: 270 hectares
Strategically located

Energy: 80 MWs
Available today

Water:
250,000+ m³/year

Gas:
22,000 mmbtu/day

Connectivity: 8 km to the International Airport · 370 km to the U.S. Border

Technology:
Long-Haul Fiber
Texas and Mexico

Property: 270 hectares Strategically located

Energy: 80 MWs Available today

Water: 250,000+ m³/year

Gas: 22,000 mmbtu/day

Connectivity: 8 km to the International Airport · 370 km to the U.S. Border

Technology: Long-Haul Fiber Texas and Mexico

Energy
Platform

The Core Advantage

=

Available now via private 80 MW switchyard

Wärtsilä on-site plant in operations since 2018

Ready to build in 20 months

Total agregated capacity

Only industrial park in Mexico with fully operational

On-site power + Immediate grid capacity + Expansion-ready infrastructure

Comprehensive Master Plan

Green Space

Efficient Mobility

State-of-the-Art Infrastructure

TRACENDE = Strategic Location

• 370 km from the US Border

• Near skilled labor pools and logistics hubs

• 8 km from Chihuahua International Airport

• $75.5 B USD in annual exports

• 156+ FDI projects between 2021-2024

• With 395,556 Chihuahua is #1 Manufacturing employer St. in Mexico

• Built on a low-latency TX to Querétaro fiber optic highway

• Higher retention. Shorter commutes. Higher participation of women

Exceptional Connectivity

Top 2 cities to live in México

25 Minutes from Downtown

Direct Access to Highway

Great Pool of Talent

Connection to TX Nat Gas Network

Direct Connection to Flo Network Infrastructure

• High-Capacity Fiber Optic Backbone from El Paso to Querétaro

• 2 underground border crossings

• Low latency: 22 milliseconds

• Fully operational since 2024

Great Connectivity to Data Center Hubs

• 53 markets

• 10,330 miles of low haul routes

• US–MX Routes

Masterplan & Infrastructure

Masterplan by Gensler

+2 Million m²
Industrial Platform

4-Phased, Scalable
Development

Optimized for Efficiency,
Flexibility, Visibility

ESG Global Standards

Holistic Development

Top-tier Infrastructure

Social and Industrial Synergy

Community Integration

Sustainable Growth